This Job consisted of refurbishing the outdated bathroom as well as the downstairs toilet. The old carpeted bathroom was replaced with click together flooring, the bath modernised with a digital shower valve and handheld to provide different methods of washing and the waste for all the facilities was hidden to provide a complete look across the room. Downstairs mirrored the same theme with a freshened image for the household.

Abbey Road 1
Before the Rip Out

Abbey Road 5
During the tiling phase end of week 1