top of page

This job consisted of refurbishing 3 bathrooms, a family bathroom, an ensuite and a downstairs toilet.  Each bathroom was half tiled and redecorated, we also installed underfloor heating in the transformed en suite which became an open planned wet room to maximise space and running the pipework into the walls to remove all boxing.

bottom of page