On this job we managed to create a substanial amount of space in comparison to before by moving the orientation of the bath to under the window and the toilet to the back wall where the waste for it and the basin were covered by a set of units. A digital shower was installed to provide the client with an overhead and handheld shower option. The ceiling was replastered and painted along with the woodwork and the tiling was taken to the ceiling to create a fully watertight environment. We also installed a radiator and placed the pipes within the wall to conceal all pipes in the room.

After Rip Out and old Bath Area flat

Old Stack was boxed, made into stud

Door repainted as well as woodwork

After Rip Out and old Bath Area flat